Calculate net pay from well logs with comprehensive sensitivity analysis. Determine pay vs. non-pay intervals using petrophysical cut-offs (Vsh, φ, Sw) and understand how cut-off variations affect net-to-gross and reserve estimates.
Net Pay is the portion of a reservoir interval that meets minimum quality standards for commercial hydrocarbon production. It is determined by applying cut-offs to key petrophysical properties:
Net Pay: Vsh < Vsh,cutoff AND φ > φcutoff AND Sw < Sw,cutoff
| Play Type | Vsh max | φ min | Sw max |
|---|---|---|---|
| Conventional | 0.50 | 0.08 | 0.65 |
| Tight Sand/Gas | 0.40 | 0.06 | 0.70 |
| Carbonate | 0.30 | 0.05 | 0.60 |
Note: Cut-offs should be calibrated to local geology, core data, and well test results.
Cut-off selection significantly affects reserve estimates:
Best Practice: Use core calibration, production tests, and analog data to justify cut-offs. Document rationale and perform sensitivity analysis for reserve reporting (SEC, SPE-PRMS).
Shale Volume (Vshale):
Vsh = 0.083 × (2^(3.7×IGR) - 1) [Larionov, Tertiary]
IGR = (GR - GRclean) / (GRshale - GRclean)
Porosity (φ):
φ = (ρma - ρb) / (ρma - ρfl) [Density]
Water Saturation (Sw):
Sw = [(a × Rw) / (φ^m × Rt)]^(1/n) [Archie]