Design directional well trajectories from surface to target. Plan build-and-hold, S-curve, and horizontal well paths with minimum curvature calculations and dogleg severity analysis.
Survey calculation method:
The minimum curvature method assumes the wellbore follows the shortest path (a circular arc) between two survey stations.
Dogleg angle (β):
cos(β) = cos(I₂ - I₁) - sin(I₁) × sin(I₂) × [1 - cos(A₂ - A₁)]
Ratio factor (RF):
RF = 2/β × tan(β/2)
Coordinates:
ΔN = ΔMD/2 × [sin(I₁)×cos(A₁) + sin(I₂)×cos(A₂)] × RF
ΔE = ΔMD/2 × [sin(I₁)×sin(A₁) + sin(I₂)×sin(A₂)] × RF
ΔTVD = ΔMD/2 × [cos(I₁) + cos(I₂)] × RF
Build-and-Hold (J-curve):
S-curve:
Horizontal:
Definition: Rate of change of wellbore direction
DLS = β / ΔMD × 30 (or × 100 for imperial)
Where β is the dogleg angle between stations
Typical limits:
Build rate considerations: